Concrete Parking Lot Building in Fremont NE - a lot built for the traffic it gets
Gravel lot rutting or old pavement breaking up? We build concrete lots sized for the cars and trucks that use them.

- Licensed and fully insured.
- Free estimates at your property.
- We reply within 1 business day.
What goes into building a concrete parking lot in Fremont?
Concrete parking lot building in Fremont, NE starts with digging out and preparing the ground. We then pour and finish a slab planned for the vehicles that will use it, so the lot drains well, stands up to winter and needs little upkeep for many years.
Most of the owners who call us run a shop, an office or a church. Some have a lot that ruts, puddles or breaks up a little more every winter, and others are building new and want the lot done right the first time. The price turns mostly on the lot's size, how thick it has to be for your traffic, how much work the soil needs and how the water will leave the site. The schedule turns on the city's review of the plans and on the weather around the pour. I'll give you your own figure in a written estimate once I've walked the site.
How do you know your lot is ready for concrete?
Ruts and potholes in gravel
If your gravel lot grows ruts and potholes every spring, the ground under it is soft and traffic is pushing it around. Every season of grading and new rock costs you money, and the holes come back wherever cars turn.
Water standing after rain
When puddles sit for a day after a storm, the lot usually has no real slope to carry the water off, or it has settled into low spots. Standing water softens the ground underneath and turns to ice in winter, so the damage keeps spreading.
Pavement breaking up
Cracked, crumbling or flaking pavement, especially near entrances where salt gets tracked in, usually means the old surface wasn't built for the load or has reached the end of its life. Patching buys you a season, but once the base underneath is gone the breakup speeds up.
How we build a concrete parking lot
I start by asking how many vehicles you expect, now and later, and whether trucks or deicers are part of the plan, because those answers give the design team and us what we need to build the lot to fit its use. On site, our crew digs out the subgrade, the soil the lot sits on, down to firm ground and packs the base in layers, since a base that's only raked level settles with the dirt and takes the slab down with it. Before we set forms we check where the water will run, so the lot sheds toward drains and away from buildings. Where the plans call for it we set rebar, the steel inside the slab that holds it together if it cracks. In hot weather we pour early in the day, because concrete that bakes in the midday sun finishes with a weak, dusty top. We give it a broom finish, a light ridged texture that gives tires and shoes grip when it's wet or icy. As soon as the slab can take the saw, we cut control joints, shallow grooves that give the concrete a planned place to crack in a straight line. Then we let it cure, the wait while the concrete gains its strength. If the budget gets tight, I'd rather you spend on the base than on the surface. Nobody sees the base on the first day, but it decides whether the lot is still flat years from now.
A lot is rarely just a slab. Light poles, sign posts, bollards and dumpster enclosures each need concrete footings set deep enough to stay put through frost, and we pour those as part of the same job. If a building or slab beside the lot has settled, ask about foundation raising before we pour, since it's easier to set the new grade against something that's back where it belongs.
New lot on open ground
This suits a new building or an empty parcel. We start from bare soil, so the base and the drainage are built right from the beginning, and this is the job where planning with the design team early pays off most.
Replacing a worn-out lot
If your old asphalt or concrete is past saving, we break it out and haul it away, then fix whatever failed underneath before we pour. Pouring new concrete over a bad base only repeats the old problem.
Adding onto your current lot
When you need more spaces, we tie the new concrete into the old lot at a clean saw-cut edge so the two meet flush. This suits owners whose lot is still sound but has become too small.
Get a written estimate for your parking lot
We reply within one business day, and I set a time to come out, walk the site and hear what you need. The estimate is free, done at your property, and there's no pressure to book.
(402) 512-8158- Based in
- Fremont, NE 68025
- Hours
- Mon–Sun: 8 AM–9 PM
What happens after you call about a parking lot
Here's how a parking lot job runs with us, from your first call to the walk-through on the finished concrete.
Call and set a visit
When you call, I set a time to come out to the property and listen to what you have in mind. If you already have drawings from an engineer or designer, have them handy for that visit.
Walk the site, get estimate
I look at the ground, where the water goes and how traffic will come and go, and then I write the estimate myself. You get it in writing, so you can see what the price covers before you decide anything.
Permits, pour date, the work
Once you're ready, we take care of any permits for our part and pick a pour date with the weather in mind. Our own crew then does the work, from the base to the last joint.
Walk the finished lot together
When we finish, I walk the lot with you and go over how to look after it. Those few minutes cover the habits that keep a lot in good shape through the winters ahead.
Why Fremont owners call Fremont Concrete for their lots
The owner checks your concrete
I come out to look at the job and write the estimate, and I'm on site to check the work while our own crew does it. The person who priced your lot is the same person watching the base go in.
Our own business since 2017
I learned the trade on a Fremont finishing crew before starting this business nine years ago, and I still answer my own phone. When you call with a question, you're talking to the person who knows your job.
Licensed and fully insured, every job
Fremont Concrete is licensed and fully insured. That protects you and your property while our crew and equipment are on your lot.
Ask for the state registration
Nebraska requires contractors to register with the Nebraska Department of Labor, and a contractor working under more than one name holds a number for each, so ask for the number under the name you're hiring. Registration is a legal requirement, not a promise of good work, which is why I'd also ask any contractor, us included, to show you lots they've poured.
If you're planning a new lot or replacing an old one, send us the details or call (402) 512-8158, and I'll set a time to come out. Thank you for considering us.
Parking lots, drainage and city review in Fremont
In Fremont, a lot's design can run through the city's Planning & Development department, which reviews civil construction drawings for grading, storm water detention, parking and landscaping, and looks at how traffic moves in and out, so your layout may change before anything is poured. The city also makes the 100-year storm the major design storm for all new developments, so runoff from a very big rain has to pass through the site without flooding any building or home. That rule shapes where your lot slopes and where its water goes. What I can't tell you without checking is whether Fremont asks for its own building or paving permit on your lot, or whether your project goes through site plan review at all. Before we start, I check with Planning & Development, on the 3rd floor at 400 E Military Ave, 402-459-2225. When our part of the work needs a permit, we handle the application and book the inspections.
On lots around here, the trouble is usually winter and water, because the ground freezes and thaws many times a season and most business lots get salted. We plan the slope and the mix around both from the first visit, and we meet the same conditions on jobs in Blair and Schuyler.
Questions about concrete parking lots in Fremont
How much does a concrete parking lot cost in Fremont NE?
Across the US, commercial concrete flatwork, the flat concrete work that includes parking lots, usually costs about $6 to $14 per square foot. That's a national figure, not our price. Where your lot lands depends on its size, its thickness, how much the soil needs and how the water is handled, and your own price comes in the written estimate after I've seen the site.
How do I know how thick my parking lot should be?
Thickness is set by the traffic the lot will carry, the soil under it and the strength of the concrete, and a lot that sees light trucks needs to be thicker than one for cars and pickups only. The usual split is that you supply the expected loads and how many vehicles will park now and later. The engineers on the design team then work out the thickness, joints, drainage and strength from there.
Do I need a permit to build a parking lot in Fremont?
If the project disturbs one acre or more of ground, it needs a state storm water permit, and Nebraska's DWEE has to receive the notice at least seven days before grading starts. Those sites also need a pollution prevention plan for erosion and sediment control while the work is going on. The city's review is a separate step, covered above.
Will a concrete parking lot hold up to winter salt?
Yes, if it's built for it. Where a lot freezes and thaws, air entrainment is essential, meaning tiny air bubbles are mixed into the concrete on purpose to give freezing water room, and a lot treated with deicers counts as severe exposure, which changes the mix, so tell us early if you plan to salt. After that, keep the joint seals in good shape, since a working seal greatly cuts how much salty water gets into a joint and a broken one lets it soak the concrete beside it.
Is it cheaper to treat poor soil under a parking lot than dig it out?
Usually, yes. Mixing cement into the soil under the pavement is usually a cost-effective alternative to removing and replacing it. I'll only know whether your soil needs either once I've looked at the ground, and the design team makes the final call.
How long does it take to build a concrete parking lot?
The schedule turns more on planning than on the pour, because the design, any city review and any permits all come before we break ground. After that, the weather sets the pour date, and I'll give you a realistic schedule once I've seen the site and the plans.
Related work around a new parking lot
Concrete footings
Light poles, bollards, sign posts and enclosure walls around a lot each need a solid footing below frost so they stay plumb and don't heave each winter.
Foundation raising
If a building, walk or slab next to your lot has sunk or tipped, raising it back first lets the new pavement meet it at the right height.
Cities we serve around Fremont
Fremont Concrete is based in Fremont, Nebraska, and builds parking lots and other concrete work in the cities around it. This site has pages for seven of them, including Gretna and La Vista, and we work in other cities nearby as well.
Fremont, NE
Plan your parking lot with a site visit
If you call (402) 512-8158 with the lot's rough size, how many vehicles you expect and whether trucks will use it, I can come out ready to talk about thickness and layout.
